Answer Posted / hafeez
As most of you have said, In the waterfall model each sterp
is frozen before the next step. that is the requirements
are frozen before the design starts, and once the design is
frozen the coding starts etc. But what will the testing
team do till then?????
In V model, based on the requirements the System test
cases are prepared, and based on the HLD (High level
document)the Integration Test cases are prepared, and based
on the LLD(Lowlevel document)the Integration Test cases are
prepared. and then the coding is done. once coding is
completed, unit, integration and system testing happens in
the sequence.
for further information:
http://s-qa.blogspot.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
As part of which test process do you determine the exit criteria?
Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is?
Demonstrated system testing experience in a large on-line environment – with at least 2 years experience including Development of test strategies development of test plans • execution of tests according to plans • defect management • using industry tools (eg HP Quality Centre formerly 'Mercury Quality Centre' (Test Director) , and • experience in interrogating and querying SQL server and Mainframe dtabases using tools such as RC Update, BRIO, SQL Server Management Studio
Explain performance testing?
What is stochastic testing?
What is CDB?
What is glossary of software qa/testing?
What the difference between a 'defect' and a 'failure' in software testing is?
What the difference between latent and masked defects is?
What is a database administrator?
tell some examples for driver and stub?
repeated testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or unrelated software component:
Mention what the difference between pilot and beta testing is?
Usually how many members work in a project & how members are now working in a project. If there r difference between the above two questions why it is so?
Hello Frds, Iam Going to attend Face to face interview on coming Monday in Wipro. Iam going with 3+ years of experience.I'm requesting u all of Frds who attended wipro recently pls post your interview experience, the questions they asked so that it will be help ful to me and other frds who are going to attend wipro.. thanks in advance