Answer Posted / hafeez
As most of you have said, In the waterfall model each sterp
is frozen before the next step. that is the requirements
are frozen before the design starts, and once the design is
frozen the coding starts etc. But what will the testing
team do till then?????
In V model, based on the requirements the System test
cases are prepared, and based on the HLD (High level
document)the Integration Test cases are prepared, and based
on the LLD(Lowlevel document)the Integration Test cases are
prepared. and then the coding is done. once coding is
completed, unit, integration and system testing happens in
the sequence.
for further information:
http://s-qa.blogspot.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What does the mclabe cyclomatic complexity of a program determine?
What are the categories of defects?
what should be analyzed in laod testing?
What is v- diagram (model)?
HI Any one can guide me What is database testing ? And How will do it . Please refer me any site or document to know more abt data base testing.
What is supplier?
i want learn "itesting tool"....which is best institutes to learn "itesting tool" in hyderabad or banglore ?plz give me reply as soon as posible?
Explain incremental integration testing?
In white box testing, what do you verify?
What is functional system testing?
What is 2 tier and 3 tier application? Pls illustrate it with appropriate example.
What is error-based testing?
why we split testing into distinct stages?
What is policy?
What is test schedule?