Answer Posted / kailash thakur
Core is the low loss link between the primary and secondary
circuits of a transformer, where electrical energy from
primary is converted to magnetic energy in the core and
again back to electrical energy in the secondary.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
For a stable system, where should the poles of a system be in a root loci plot?
How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?
What would be the size of wire used for 2 Ton of window A.C?
what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.
PLS MENTION QUESTIONS ASKED IN IOCL INTERVIEW FOR ELECTRICAL EGG??
How to calculate flow of water delivered by pump when pressure & size of pipe line is given
What are the advantages of hydropower?
why power not passes in plastic and rubber material
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
What is the difference between in Fourier series and Fourier Transform. and please tell me the difference between both of them and the why we use them in communication system?
The Howland current source produces a A Unidirectional floating load current B Bidirectional single-ended load current C Unidirectional single-ended load current D Bidirectional floating load current
Stator of 3-phase IM has 3 slots per pole per phase. If supply frequency is 50 Hz, calculate the speed of rotating stator flux A 1000 rpm B 500 rpm C 1500 rpm D 1440 rpm
What is the dc grounding system and what is diff between AC/DC grounding system?
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?