what is the basic difference between a singly reinforce
section & a doubly reinforce section?

Answer Posted / prakash

In singly reinforced section main steel is at bottom for
tensile stresses. while in case of doubly reinforced
section it is on both sides for comp and tension.

Is This Answer Correct ?    179 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

1768


Which are the top apps for you civil engineer?

717


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2293


How to find out slope footing concrete

2422


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1128






I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1026


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

1805


how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2

1434


what is m30 in concrete tiles

1888


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

1713


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1424


what is the type of earthing

1767


How to compute minimum number of columns required for a site from area of site?

1528


Cement consumption of one cubic meter of aerocon blocks masonry?

3661


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1288