What is construction joint and
expansion joint in CC pavements
Answer Posted / narendra
(From wikie)
An expansion joint is an assembly designed to safely absorb
the heat-induced expansion and contraction of various
construction materials, to absorb vibration, or to allow
movement due to ground settlement or earthquakes. They are
commonly found between sections of sidewalks, bridges,
railway tracks, piping systems, and other structures.
Throughout the year, building faces, concrete slabs, and
pipelines will expand and contract due to the warming and
cooling through seasonal variation, or due to other heat
sources. Before expansion joint gaps were built into these
structures, they would crack under the stress induced.
The expansion joint can be as simple as a caulked
separation between two sections of the same materials. More
recently, expansion joints have been included in the design
of, or added to existing, brick exterior veneer walls for
similar purposes. In concrete and concrete block ("CMU")
construction, the term applied is control joint, but serves
a similar purpose.
Construction Joints
Construction joints (figures 7-36,7-37,7-38, and 7-39) are
made where the concrete placement operations end for the
day or where one structural element is cast against
previously placed concrete. These joints allow some load to
be transferred from one structural element to another
through the use of keys or (for some slabs and pavement)
dowels. Note that the construction joint extends entirely
through the concrete element.(
http://www.waybuilder.net/sweethaven/BldgConst/Building01/de
fault.asp?iNum=0603)
| Is This Answer Correct ? | 24 Yes | 2 No |
Post New Answer View All Answers
Mention different types of roof systems?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
what r you reqired for concrete baching plant?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
How to calculate the load of partion in flat slab if we use brick?
what values & beliefs have guided you in your career path
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how can we calculate steel value, depending on load
How do you determine specific gravity of cement?
Define What are the uses of alloys in daily life and how are alloys made?
Why do you want to work here
What are the disadvantages while using stone dust as filler in pavements?
how much one carpenter can doing shuttering of slab in one day
What do you mean by bond? What are the different types of bonds?
What is the use of mirror command?