what is the difference between arch dam and gravity dam.
Name a gravity dam in India
Answer Posted / narendra
Unlike the concrete gravity dams, arch dams use a special
arch shape (curved toward upstream) to transfer the force
to the two sides of the valley and the foundation.
Idukki Dam is the first Arch Dam in India,
kakrapar dam on river tapi is the
exampal of the gravity dam.
| Is This Answer Correct ? | 17 Yes | 5 No |
Post New Answer View All Answers
dialation means
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
Explain the various stages of the project planning process in construction?
pls mail some more tecnical qustions at msaranya2610@gmail.com
why is the column design?
How to calculate unit weight of concrete for m40 grade.
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
where can i get the previous question papers for rrb section enginerr (civil)
how to estimate material requirement for an area of house in square feet?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
Define What is made from large rocks, which protects the base of cliffs?