What is D check in a Diesel generator for 1000kva DG
Answer Posted / reddy
gnerally DG requires servicing like B-Check, C-check and D-
check.after 300 running hrs/ one month b check will be
done, in this they will clean all the filters and change
the oil just like bike servicing. in c-check(after
1500hrs), they change gaskit of chambers. in D-check(after
6000hrs, they will check b+C checks, and they will check
cylinders and injection ckts
| Is This Answer Correct ? | 73 Yes | 15 No |
Post New Answer View All Answers
what is mean by PIR in circuitbreaker and give me detail of that?
with help of neat sketch explain principle of TIG welding process
Is there any reason that we get shock on touching phase wire because the earth is at neutral potential? Is there any reason that the earth is at neutral potential because the neutral is earthed in apower station
why can the rotor of 3 phase slip ring induction motor not be a 2 phase rotor?
what is the formula of starting current of 3phase and 1 phase motor???
In constant power region of 3-phase IM torque-speed characteristics, if frequency increases slip A does not alter B decreases C increases D none of above
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
What will happen if i used 11KV earth ht kit to 11 KV / 11 KV cable termination?
Define resonant peak?
i will applied in 1U-1W on 440 volt primary delta side. what is the result of magtic balance test
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
What are the types of windings according to the construction?
what is the minimum clearance between a 11KV 150KVAR capacitor cell and series reactor.can a series reactor can be mounted in the same structure of the capacitor cells structure
Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?