Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How will I know that how many batteries I should connect to
my UPS unit?

Answer Posted / shamim ahmed

You Should Know the KVA rating of your UPS, time you want
to get Back-up & the Battery input voltage of your UPS.If
your UPS rating is X , time T and the UPS input voltage is
V then the Battery current capacity is:

I=X*T*1.25/V*0.7 AHr

suppose battery input voltage of your UPS is 36V and you
find the Battery capacity from calculation is 300Ahr.

then you can use 3pcs 12V 300AHr battery in series or you
can use 2pcs 36V 150AHr battery in parallel.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience

1624


Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..

2145


Advantage of LT panel vs HT panel

2908


how to calculate maximum current

2303


why steady state stability limit is greater than transient stability limit ? How it can be explained ?

2900


What is the operating principle of turbo-generator.

2318


how to calculate the mesh earth network resistance in such substation, is there any recommended resistance values with references , thanks!

2317


WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.

2126


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2620


please I wont know how to calculate the vector group for power transformer ZNyn11 best regard.

1828


what is p.s impedance measurement test in earthing transformer?

2390


in single phase converter, the no.of scr's conducting during overlap a)1 b)2 c)3 d)4

2048


How to connect the chemical earthing and complete process tell me plz

1849


I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...

1554


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1441