Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between arch dam and gravity dam.
Name a gravity dam in India

Answer Posted / sivaraj

the length of the arch dam is less and depth is high. the arch dam distributes on both side of dam.

Is This Answer Correct ?    17 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is the difference between built area and super built up area?

1198


What is chemical composion test

2101


The foundations are placed below ground level, to increase?

1259


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

2175


Explain the mechanism of cavitations in pipes and drains?

1122


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

2000


how to disign cuplock shuttering and it's matireal requirement snd any related web site

3032


who to find building iron rod strenth

2179


how to find quantity of concrete in PCC M15

2141


How much cement and sand required for 9"brick wall per square metre

2926


cause of cylinder test failure

3310


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3991


What is the software used in civil engineering?

1110


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

2256


Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m

1746