Answer Posted / ibrahim
electrical engineering is abranch of enfgineering basicaly
it deals with, electrical machines -operation ,
design,maintanace,power system,power electronics.,and some
more................
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
1.WHAT IS A SMART CAPABLE DB ( DISTRIBUTION BOX) ? 2. HOW TO DECIDE THE TYPE OF DB TO BE USED ( RECESSED/ PLUG TYPE/ SMART ETC ETC? 3. WHAT IS MILLENEUM BUS BAR USED IN DB? 4.DIFFERENTIATE MCCB AND MCB.
diff b/w elcb and rccb
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
Maintenance of transformer???
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
In vapour absorption refrigeration machine fluids used are
What can you contribute to the progress of our Company as an employee if you are selected?
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?
HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?
hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com
Define sensitivity?
1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be
What is the efficiency during maximum power transfer?
What is different between resistance grounding system and resistance earthing system?
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .