Answer Posted / suhas
we wiill get shock from dc when the voltage is above some
level
| Is This Answer Correct ? | 8 Yes | 14 No |
Post New Answer View All Answers
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.
how the aircraft outer body and inner body is separated ?
Why in 6 KV XLPE cable termination kit used and why not in 380 V xlpe cable same is not used
Where can I get Iidian straderd specifications for electrical items or works in web? please help me.
I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...
Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.
How will polarity test of Dy5 Transformer ?
Explain difference between stand by earth fault and residual earth fault protection?
what is the safety points of vaccum circuit breaker.
what & how to check the lightning arrester
In Power Line Communication (PLC) the wave trap is used to block communication signals from entering neighboring lines. My question is this: Why do they allow for different filtering arrangements on these wave traps? Isn't it always going to be a low pass filter since we want the power frequency to go through, and the comm signal blocked?
Which do you think is the most significant cause of energy loss in a factory?
What does the a,b,c of 95a,95b,95c relays denotes?
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?