what is the difference between power and distribution
transformer?
Answer Posted / narendra verma
in short we can say that power trans belongs to the voltae
ratings above the 33kv and distribution trans are for low
voltages.....
it is also right that the size of the power trans is much-
much bigger then the distribution trans, that is all bcoz
of the rating and the operating voltage.........
| Is This Answer Correct ? | 10 Yes | 14 No |
Post New Answer View All Answers
how to calculate cable size in diffrent loads?
what is earth resistance? how to measured? and give values at power station and mcc area?
Explain the purpose of inductor in an electric circuit?
how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me
Difference between transition and diffusion capacitance
1.what is mean by 8/20 micro sec waveshape
What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?
What is the difference between Delta & Wye windings?
What is slip in an induction motor?
how to check avr of dg set of 125kva
Why armature rheostat is kept in maximum position?
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
When will you multiply and devide with derating factors to the actual value while sizing the cable?
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?