Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHY WE CAN GENERATE POWER IN 3PHASE MODE ONLY NOT IN 4 OR 5
PHASE?

Answer Posted / bmw6633@gmail.com

it is easy for compatability ,not more risk involved and the
3phase will generate 440v.

Is This Answer Correct ?    3 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why co incidence factor considered in transformer sizing?

1805


what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....

1898


how to calculate micom relay earth falt time and current sertting

2406


technically, what is the reason behind starting the motor star the delta connection .. and what other ways to do this rather than using " star-delta transformer"

1921


how does high earth to neutral voltage affects electronic circuit?

1863


hwat type of motor is used in thermal gas turbine hydro nuclear power plants and why

1834


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

1922


IF HT CAPACITOR IN ON POSITION IS THERE ANY LOSSES I.S I SQURE OCCURS IN THE SYSTEM

2092


to hook up ten 50 amp rv pedastels at a lenth of 600 feet from the service what size will my service need to be and the size of wire will I have to run to each pedastel in series??????

2023


Please, if 1kw is equal to 1.25kva; how then do I know how many kva in 7.5kw?

1582


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1739


WHY THE DIMENSION OF TWO SAME RATED MACHINE IS DIFFERENT ?

2094


plz send me the procedure and syllabus for mseb exam

3804


What is meaning of out of phase (making & breaking) capacity And how to calculate

2143


explain the mode of metal iranafer in Co,welding

1522