Answer Posted / santosh
it is artificial system of outflow to discharge the waste
water & unnecesarry refuse from perticular residential or
working place
Is This Answer Correct ? | 23 Yes | 15 No |
Post New Answer View All Answers
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What are your future hopes for this job?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How many types of slabs are there & how to design it?
what is called Bulk Density of aggregate?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
How is the leaning tower of pisa supported?
How does a traffic light signal work ?
What is the difference between EPC,DBOOT and BOOT.
How many axes do cartesian coordinate system has?
will fix foundation bolts at site with out template is there any procedure?
what is the breaking strength of wall tiles
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
What is the ideal size of the living room ranges from small to large size?
why is the column design?