Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate AH of a battery?

Answer Posted / sunil kumar

AH Ampear Hour= ampear X hour, defined as constant ampear
delevered in hour. 180 AH meanes 180 A current will be
delivered in one hour.

Is This Answer Correct ?    43 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the solution for meger test failed the MV cable?

4371


Write the analogous electrical elements in force current analogy for the elements of mechanical translational system.

1327


In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.

2211


sir plz send some previous year questions of jspl.

1993


draw the block diagram of fire alarm?

5476


What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?

3744


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1647


How Self works in DG set

2113


what is the difference between electrical choke and electronic choke?

2566


with 3 phase board on a 63 amp rcd is it ok to have 6 electrical showers 2 on each phase and what problems could happen

1888


How to calculate the multiplying factor for energy meter with ct ratio given

2085


How select ELCB for 32amp. socket having quantity 12Nos. We have to do this wiring in PLANT. Please Also explain the incoming cable specification.

1930


We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.

1916


what is sevice settings for mccb?How can be it setted?

2310


Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.

3856