Answer Posted / swamy
VCB stands for vacume circuit breaker. it is get contact by
produceing arc in vacume.VCB is used in HT side ie 11kv and
above.
| Is This Answer Correct ? | 21 Yes | 8 No |
Post New Answer View All Answers
Load transfer in 11kv double busbar switchgear - operation.
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
what are the parameters plays a major role in Potential transformer Burden calculation??
what is the preventive maintence for ht panels and busbars and vcb abd acb's.
What is reverse power relay?
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
What should be the protection scheme for a 15kw, 3-phase motor working in a lathe machine.
What is boucholz relay and the significance of it in to the trformer?
UG cable sizes were specified in sqmm. But practically its not coming to mesure. What's the reason for that? And how they specify the size of the cable?
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
what is the concept of directional power?
I have a drawing of a wound rotor induction motor for a crane. This crane motor has 5 forward speeds & 5 reverse speed implemented of course with different amount of resistance for each speed setting selected. What has got me scratching around is the fact that 8 of the 10 speed selections switch in uneven (unbalanced) amounts of resistances on each of the 3 connections to the motor's rotor.Can this be possible? I would have assumed this would produce unbalanced rotor currents and therefore vibration in the motor. I would greatly appreciate anyone's comments on this. Many thanks, Confused.
how to calculate cable size in diffrent loads?
how to find the multiplication factor for digital energy meter and analog energy meter
After synchronization with grid what is the demand value QKVAR and how we will maintain that?