Answer Posted / vinod loonawat
If the soil is soft then as per the soil report one shold
find till what depth do you find a hard rock strata, the
foundation also depends on the total height of the super
structure and the load capacity therefore one can use the
combination of Pile and raft foundation i.e take a group of
piles at the positon of the Columns and above that one can
have a raft.
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
Explain what are the skills required to become an architect?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
what motivates you to do a good job
How do you maintain water pressure?
What is the zero value in quantity surveying
What is rate of concrete surface rendering work per sqm
Describe the role of independent Quantity surveyor?
What is the use of mirror command?
what is grade intersection?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is the anchorage length of reinforcement.