in electrical fire which group fier Extinguisher as used

Answer Posted / tarun tewari

genrally co2.this is E class of fire mentioned on the
bottle/extingusher.one extingusher can be used in one or
more classes that is ABCDE.But procedure says initially
start extinguishing with co2 in meantime isolate that
circuit through CB or MCCB &then you can use A class of
extinguisher which is cheaper & more available.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

1575


what is upper impedance and lower impedance of a distance relay

1583


Why do we require transformer with less specific weight if supply frequency is increased?

1121


What is NGR . What is the purpose of 10 sec ,60 sec rating of NGR.

1244


What is measurement?

746






what is the necessity of under ground cables ??

1622


How to Decide the Location of Earth pit for Compressor in Oil Depo? and How to measure the resistance of earth pit Pls explain me with the help of Circuit Diagram?

1909


why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?

4651


How could a garment factory benefit from renewable energy

2345


What is Plank's Law?

684


What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?

1620


Which standard we are following earthing resistance test

974


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1556


what happen if the parallel generator phase angle shift by 1 degree in manual mode

1560


What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

1755