Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

when giving a supply to wounded coil it will get
magnetised, but the same is not if it is not wounded on a
core..and it is getiing short....why.......

Answer Posted / srk

Dear Kk, i m also confussed from this quastion is that when
we give the supply of wounded coil it is magnetic why it is
not getting short ...?

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

State and define ohm’s law?

1197


why high speed tripping relay will be used in tripping circuit why not normal relay

1427


in dc shunt motor if field winding is shorted then

1912


how to calculate the power factor when instantaneous voltage and current has harmonics in it ?

2032


What are the advantages of instrument transformer?

1223


why do we put a transformer on soak before loading it

1193


description with working of all parts of a Diesel generator???????

2545


what is a bus post insulator? explain its application in a substation.

12673


what is the role of energy meter in distribution system ?

1245


Why do not we prefer non conventional sources of energy to conventional sources?

1244


What is the difference between a verilog task and verilog function?

1389


Can we check ELCB constantly from R1 to R8 phase in 1 no DB?

1760


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2088


All tape of electrical questions Answers tape of motor transformer e.o.t crane

2697


What is hipot test procedure?

1521