What process model u r using 4 current project.
(Eg: Water fall model, prototype model etc) and why?
Answer Posted / saritha
In our company we are using modified V model ..as
development and testing of the project are done
simultaneously
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
hi everyone i want to download test director,winrunner,qtp latest versions pls help me
wat r d schedules for testing?
What is path testing?
What is vdd - version description document?
Mention what the meaning of breath testing is?
Mention what the difference between pilot and beta testing is?
What is path analysis?
Hi,can anyone help me with sap testing.how is sap testing done
IF i have two columns in Database , While using Database output value ,allthe values in the two column are set as a single row in the QTP datatable, can u suggest me a idea so that QTP Runtime datatable displays the values as it is in the database
Explain traceability matrix?
What is brainstorming?
What is user documentation?
What type of review requires formal entry and exit criteria, including metrics?
What is a user manual?
What is difference between validation and verification?