why should we select you?give reason in one sentence

Answer Posted / zeeshan

I AM UP-TODATE WITH THE MARKET

Is This Answer Correct ?    4 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi i got i-20 from my US university for studing MS in Economics. i am gong to face the interview soon. but i do not have any score in IELTS/TOFLE or GMAT.i do not have the time to sit for it. Does this effect on getting visa. Plz. let me know...

1614


4. State & explain the various financial & non- financial incentives to motivate the people in an organisation.

1496


What Do you Mean by Wall Management?

1624


Hi! frnds i m gonna attend de sbi clerical interview dis month.. so could u guide me wid wat r de ques dat r generally expected to ask in de interview?n also how long de interview goes on?

1526


Q.4. Method(s) to settle Industrial Disputes is/ are: I. Investigation. II. Conciliation. III. Arbitration. (a). I&II. (b). Only I ©. I, II & III. (d). None of these.

1460






Research serves a single purpose-that of providing information to assist marketing manager to make better decisions? Elaborate this statement.

1606


Can my friend sponsor me for study in UK? If yes, what are the basic question asked by Embassies??

1591


Give a relationship between concept, Hypothesis and Theory. What are the Salient features and classifications?

1752


what are the reasons for chossing banking as u r carrer?

1634


What major issues have arisen?

649


Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.

1675


how long you will worked with us???? why you left the previous company? how can you manage our company?

1384


To make students apply the managerial effectiveness lessons learned in the class in the real life. Also to develop their analytical skills based upon their learning

1376


how does a bank finance working capital

1399


WHAT IS THE DIFFERENCE BETWEEN CEO,MD AND CHAIRMAN

2215