Answer Posted / kripa
1.Verify whether time displayed by clock is correct.
2.Verify existance of all the three needles of clock and
their accurance.
3.Verify the movement of seconds needle and verify it with
the minute needle.
4.Verify the numbers displayed in the clock are
understandable by user.
5.Check the quality of glass of the clock.
6.Check whether the hole provided for hanging it on wall is
present and if present is it user-friendly.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Anyone attended the manual testing interview with L&T infotech in recent past. please let me know the type of questions they can ask especially in PM round. Thanks
What is the difference between a defect and a failure?
what technical problem u face in your module please tell what is it mean its any bug or anything else i want ans give any example which ever modul u r working for u can give me any example
How can we test for drastic (severe) memory leakages?
how can u prepare the test plan?
What is bidirectional traceability ??? and how it is implemented
How to do the performance testing manually? Does you have a test case for that?
i) functional test cases can we consider for regression test ? or we have to write separet test cases for regression test ? ii) How to write the system test case and what are the technique shall we have to follow ?
Which are the different tests for apparel testing?
structure of an incident report is covered in stand for software test document IEEE 829 and is called as?
How do you scope,organise and execute a test project.
You want a automation tool to be used for your project. How will you convince the client for the same. Please give me specific answer.
How does a coverage tool work?
how many modules in ur bank project? what functionalities r there?how did u check? could u plz expalin ur banking project?
How do your characteristics compare to the profile of the ideal manager that you just described?