what is project testing & product testing, and what is the
differene ? plz explan with example
Answer Posted / shiva kumar
Project Testing:
1. Generally project testing done based on Client requirements
2. Scope of security testing is limited
3. User acceptance testing is required
4. Will have only one release.
5. unsolved Bugs will be fixed in maintenance stage
Product testing:
1. Testing done based on over all requirements and current
market standards.
2. More security testing is required
3. No User acceptance testing
4. More compatibility testing will performed.
5. Will have no of releases.
6. unsolved Bugs will fixed in next releases
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Hi, i am looking job in perfomance testing using Loadrunner can any body help me a project in any domine plz(Usah) chs_29@rediffmail.com
What is known as data-driven testing?
What is meant my Firewall testing? how the testing is performed on it?
Why you are selected software testing as career ?
Enlist some bug status along with its description?
Am putting E-commerce project in my resume can any one please tell me about E-commerce application explaination..
Can you please explain about the erp project
can someone give me a brief idea about embedded testing.. i know both embedded system concepts and testing concepts.. i just want to know what we have to do for embedded testing
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.
can somebody plz tel me about financial domain for manual tester?? which kind of application use and what is the approach of testing??
what is entry and exit criteria and explain it?
What are the basic forms of variations?
What is Registry?
hi friends .......... from srs to signoff what r the tests the testing team will conduct either sequentially or parallel pls advice thanks in advance
how to write defects in excel sheets when defects occured