why the flooring of substation is done with small pebbles or
stones..?

Answer Posted / ganesan.n

If oil got leaked from transformer means it will br jerky
around the transformer if pebbles are not provided around
the transformer!! so only they are providing pebbles
flooring around the transformer!!

Is This Answer Correct ?    4 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are conduct on the testing in cf in ur site?

1192


which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?

1569


Why only sinusoidal ac voltages are generated?why not triangular or sawtooth?

1575


What are the advantages of stationary armature and rotating field system?

704


Explain about technical and non technical losses in distribution system?

627






what are the preventive maintanance actions taken for air circuit breaker? please answer me

1562


What's mean HVF & HAF in Vacuum Circuit Breaker?

4740


What are the basic elements used for modeling mechanical rotational system?

621


What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?

743


what is the stear deltaprinceple?

1413


how to read idmt curva

1718


How Self works in DG set

1419


How generating electric power export to grid from the generating station ?

1411


What are dependent sources?

664


what is meant by brushed alternator & its working principle ?

1546