we hav seen in electric engine of trains only 1 wired slidng
conecctn is there frm ovrhead line,howevr to complete a ckt
in dc postv n negtv two conection has to b there...so where
is tht negative is been connectd or where it is grounded...?
Answer Posted / naresh
it is completed through therails to ground through the
wheels
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
What is Diff btw Fire Alarm & VESDA System???
pls tell what are doing the three phase motor star and delta connetion with circuit diagram and control wiring .
In single phase ac ups supply when current is measured with tong tester neutral current is found more than phase current.What is the reason?
two way ckt diagram can be drawn by how many ways? give diagram
Can XLPE/SWB/PVC (P3) 7C X 2.5mm2 be replaced by Can XLPE/SWB/PVC (P2) 7C X 2.5mm2??? P3 vs P2
Is any AC drive(VFD) had a feature of DC injection braking? if available please mention the detail. i.e drive can supply braking torque when the motor in idle state.
What do you mean by a phase angel of instrument transformer?
Show Details FROM:Muhammed Ikram TO:qa@allinterview.com Message flagged Saturday, June 4, 2011 10:07 PMMessage bodyHello all, i want to ask a question to all of you that what is VMM (voltage monitoring module )? how it work,s? i heard somewhere that it compare 1 phase voltage to other phase voltage. but there is also some setting on it. how to set it,s setting. please tell me briefly. Thank,s and Regard,s. Muhammed Ikram.
what is the difference between oil surge relay and buchholz relay.
Electrical Engineering
where can the transformer having vector group Yny0 be used??
If anyone would like to know or practice for FEWA papers contact me on mohamedrashad2@hotmail.com Just completed the supervisor exam in April 2021
What is the formula to calculate the rating of power cable for three phase current.
what is earthing transformer? draw the winding dia.of earthing transformer.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.