Answer Posted / chimbu
zero sequence current means what u will get when u will
have ground fault on a three phase system.
| Is This Answer Correct ? | 27 Yes | 16 No |
Post New Answer View All Answers
WHAT WOULD BE THE FORMULA OF WIRE GAUGE FOR A FULL LOAD CURRENT
what size steel armoured cable is required to support 1500kva capacity. would 70mm squared be enough or would I need 90 or 120mm squared 3c plus earth
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
what happen if generator of micro hydro running at only a small percentage of its capacity, as a comparison, if the diesel generator that runs on only a fraction of its capacity there will be a wet stacking
why induction motors are rated at 0.8 power factor.
How to findout raw or ups power? its not indicated in socket,
What is resolution of a measurement?
If rotor works in clock wise what happens
How many turns are there in primary winding? (In Transformer)
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
how to calculate kvar in Akiva
What happen to the transformer if the OLTC frequently used for lower and raise occured 50times daily?
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The rotor reactance at stand still is A 2 ohm B 1.25 ohm C 3.15 ohm D 2.25 ohm
HOW TO WRITE A QUENTION ANSWER? I MEAN SHORT OR LENGHTHY ? OR FROM THE BOOK AS BOOK..... SOME TIME WE GIVE A ANS FROM THE BOOK AS LIKE BOOK ND WE GET MINIMUM 60% MARKS OR MORE THEN....... THEN HOW TO FILL THE Q-PAPER?
if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .