Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is derating factor in Cable ? how we minimise this?

Answer Posted / mohamed abd elhamid elsaied

Due to partial discharges in cable it can't be utilized to
it's rated capacity.
As current flowing to charge cable capacitance is extra
burden on that which will make it to carry less current for
load.
To reduce this good insulation material should be use.
and this mean that if cable can its rated 100 Amp. it will
max amp 95 Amp.

Is This Answer Correct ?    7 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate transformer turn primary & secondary side 11kv to 420v

2252


What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.

1836


how many current required for hypo test

2042


what is rating boiler

2049


How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?

2098


How does zener phenomenon differ from avalanche breakdown?

1221


What is a copper loss or i2r loss pc?

1197


What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

2305


What is the classification of hydro projects based on installed capacity?

1241


why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?

1981


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

2038


how to calculate slip ring induction motor stator and rotor currents??

2317


any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?

2318


State norton’s theorem?

1171


What are the conditions for sustained oscillator or what is backhouse criterion?

1194