Answer Posted / irfan memon
Basically the electrical engineer is one who knows the
Electrical problems, can solve the problems, assambling and
re-assambling of Electrical equipment with proper wiring,
also can improves the efficiency of equipment with genious
mind.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is meant by loss of field in a DC motor? how a universal motor works?
What the main causes of transient interruptions on Over-Head Distribution Lines?
how to calculate fault level?
why core is useful for a transformer ?and also in its operation ?
What is the difference between a verilog task and a verilog function?
Why saturation region slowly shifted in the left side?
What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?
i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
If we connect a motor and generator together (I mean that the generator gives the motor electricity and the motor gives the generator movement) regardless the losses. Will the generator still generate and the motor still move?
why swinburnes test cannot be performed on series machines?explain
What does a Bode plot tell you?
How could I get a certificate of competency as Electrical Supervisor? I have completed By BTech in Electrical this year(2012) for VJTI Mumbai Maharashtra. Is it compulsory to be produced while joining?
why we get 2 differnet values for power factor in 2 watt meter method in 3 phase
I HAVE A INCOMING 100A MCCB TPN 25KA, CABLE LENGHT OF 80M 70MM CABLE SIZE FROM MAIN SUBBOARD TO NEW DB.BASE ON THE FAULT LEVEL SETTING OF 45KA.I WOULD LIKE TO FIND OUT 25KA ENOUGH KA. APPRECIATE IF SOMEBODY CAN ASSIST ME WITH FORMULA FOR THIS. FRM: JEFF