what is power factor? whether it should be high or low? why?
Answer Posted / pavan chelluri
Powerfactor is defined as the cosine angle between the
active power and apparentpower
P.F=KW(ActivePower)/KVA(ReactivePower)
Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
What is the difference between electronic regulator and ordinary rheostat regulator for fans?
how single phase preventer works ?
11kv/433v delta/star distribution transformer primary side full load Ht current is 83.33A in , but input side VCB rating 800A.why?
To make a basic instrumentation amplifier, it takes A One op-amp with a certain feedback arrangement B Two op-amp and seven resistors C Three op-amps and seven capacitors D Three op-amps and seven resistors
during installation time of transformer and alternator which points we have to observed?
please give me all the Alarm .Trip ,Safety Relays & Conditions of Diesel-generators mail me on ashokbabunhce@gmail.com
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?
why u r living from presentaly working.
what is the mechanism of operation of brushless dc motor why is it more wexpensive then ordinary permanent magnet motors
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?
hi, i finished b.tech eee in 2008, im worked in dg sets mfg company , now i left job in 6months back, now again i want get job core side, how can i get? is there any couses we have learn to get better oppurtunity? /
Explain about p.t?