Which is the most important phase in SDLC
Answer Posted / pk
Requiremennt gathering is the most imp stage. If the
requirements are not clearely identified then the effect of
it cascades to all the later stages. This can cost a lot in
terms of money as well as resource since most of the work
will be redone.
PK.
| Is This Answer Correct ? | 66 Yes | 7 No |
Post New Answer View All Answers
What are the benefits of creating multiple actions within any virtual user script?
How many bugs occured will be considerd appropriate over 1000 steps when inspecting software? Describle an approriate Bug value.
which domain is of high demand for software testing, Right now i am working in Education domain .How about demand for Education domain and which companies are recruiting in education domain
What is your daily process? I have 2+EXP IN MANUAL TESTING.PLEASE SUGGEST ME HOW i ANSWER
Hi Everybody could you please send me the ISTQB Material to my mail id karthik18487@gmail.com Thanking you in advance
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
Why would we not include these?
Can you do system testing at any stage of sdlc?
what are all the things we will include in " what to be tested and what not to be tested" in Test Plan
On what basis you are fixing up the time for project completion?
HI. ANYONE HAS ATTENDED INTERVIEW FOR TESTING IN MINDKRAFT GLOBAL. I HAVE WRITTEN TEST FOR SOFTWARE TESTING. CAN ANYONE TELL ME WHAT ALL QUESTIONS CANBE ASKED. PLS REPLY. THANK YOU
What are the different levels of manual testing?
Can you explain decision tables?
Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks
What are the cases when you’ll consider to choose automated testing over manual testing?