what is the use of starter in tube light?and what it
contains
Answer Posted / jale singh yadav
FOR IONIZATION OF GAS IN TUBE LIGHTS, IT REQUIRES HIGH
VOLTAGE NEAR TO 1100V OR 1200V ACROSS ITS TERMINALS.
STARTER HELPS CHOKE COIL FOR GENERATING THIS MUCH OF
VOLTAGE ACROSS THE TUBELIGHT TERMINALS FOR SHORT TIME
PERIOD SO THAT IONIZATION CAN HAPPEN INSIDE THE TUBELIGHT.
STARTER CONTAINS BIMETLIC CONTACT.AT THE TIME OF STARTING
IT WILL BE NORMALLY CLOSED & AFTER SOME TIME(SHORT TIME) IT
WILL OPEN & DUE TO THIS OPENING AS PER LANZ LAW CHOKE COIL
PRODUCE HIGH VOLTAGE ACROSS THE TUBELIGHT TERMINALS.
| Is This Answer Correct ? | 140 Yes | 13 No |
Post New Answer View All Answers
How much pf maintan in dg set in 6o% load,when Dg runnig Neutaal Earthing removed what happen.
what is the working principle of a DG Set, Alternator, & exiter
what should be correct gas pressures to be a 1.5 ac unite
how the characterstics of control valve being done
Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel
What is transister define the transister ammiter ,base, colector.
What is Phase margin?
TRAFO 1. WHY BREATHER IS USED. 2. WHY OIL GOES DOWN IN CONSERVATOR TANK. 3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF TRANSFORMER. 4. HOW TO CHECK IR VALUE OF TRANSFORMER. 5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM. 6. OFF LOAD TAP CHANGER OPERATION PROCEDURE. 7. TR. SHUTDOWN / ISOLATION PROCEDURE. 8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO. 9. WHY TR. HAS OLTC IN HV SIDE. 10. WHAT IS % IMPEDANCE. 11. WHY TR. RATING IN MVA. 12. WHAT IS VECTOR GROUP IN TR. 13. CONDITION FOR PARALLEL OPERATION OF TRS. 14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE. 15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT YOU WILL DO. 16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP. PROTECTION 17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR. 18. DIFFERENT TYPES OF FAULTS IN TR. Trafo - Page-1 of 2 19. WHAT HAPPENS WHEN TR. CHARGED FROM LV. 20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO BETWEEN LV WINDING AND EARTH. 21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND OLTC TANK. 22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK 23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE. 24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER. 25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN POWER TR. 26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE. 27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION DURING MAINTENANCE. Trafo - Page 2 of 2
neutral earth resistance testing is it possible for transformer while in load condition
what is the difference b/w pvc cu conductor and cu breaded wire..?
How convergengr of nr method is not dependent on selection of slack bus and how gauss siedel method depends?
at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.
List the time domain specifications.
howmany electrician should maintain for a 1000 kva used plant... in kerala..
What happens when two positively charged material is placed together?