In the defect life cycle, if you find a defect in QC and
think that it is not a valid defect. what will you do? just
close it or store it in any document for future review, if
yes what type of document and where?
Answer Posted / sharmila
The invalidity of the defect should be confirmed by the BA
then the defects status has to changed to "Non Defect"
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is Test Builder?(Suma)
How do we import testcases written in excel to test director?
What is the difference between master test plan and test plan?
how do u call data file and gui file in testdirector
How can we add requirements to test cases in test director?
how can we see all fields in test director
Can you retrieve a test case once you have deleted them in test director?
How do I run reports from test director?
What databases can test director reside on?
How can we export multiple test cases from td in a single go?
What is EXPORT AND IMPORT in Quality Center (pl. Explain with easy steps to understand.)
Can you please explain the procedure of connecting testdirector in qtp?
How to add test id to testplan?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?
What are the 3 views and what is the purpose of each view?