Answer Posted / salil ahmad ansari
MCCB-Moulded case circuit breaker
ACB-Air circuit breaker
VCB-Versatrip circuit breaker
| Is This Answer Correct ? | 3 Yes | 32 No |
Post New Answer View All Answers
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
what is the minimum clearance between a 11KV 150KVAR capacitor cell and series reactor.can a series reactor can be mounted in the same structure of the capacitor cells structure
sir vizag steel ka junior trainee ka paper kitne number ka ayega
What determines the thickness of the lamination or stamping?
if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?
help me with the question that might be ask on the interview for technical position
What does the term “voltage regulation” means?
What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.
What is the power requirement of tamil nadu for one month?
how to find motors H.P. whout any rating? (only give you a motor and multimeter)
whatare the disadvantages occur,if the form factor of transmission will not be equal to 1.11
why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.
How to know about the rating(voltage and other) of induction motor if its name plate is missing at the manufacturing site.
A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)