What is logic behind the use of Steel bar insted of gold
bar?
Answer Posted / pooja
gold bar is very rare& costtly, hence uneconomical to use
as well it is much ductile in its pure state hence has
lesser tensile strenth than steel so steel bar is used
instead of steel
| Is This Answer Correct ? | 22 Yes | 7 No |
Post New Answer View All Answers
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
what is the meaning of degreasing of the euipment or line.
What is oneside mat. And explain
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
What are the responsibilities of a site manager?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is thumb rule in quality and quantity estimation of a Residential building??
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
What is the procedure of concealed plumbing in toilets?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why we use aggregate,sand with cement in concrete?