how power saving takes place through VFD?

Answer Posted / sathiajith

speed is directly proportional to the cube of power. ie.
20% speed is reduced,50% is the power saving. Also torque
is varying according to the load. Hence current is reduced
while less torque is required.Since it has a soft start,
starting current also can be reduced.

Is This Answer Correct ?    5 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how we calculate electrical load on a building according to area?

2259


Difference between field rheostat and armature rheostat.

690


solar energy light efficiency & disadvantages?

1566


why three phase capacitor takes unbalanced current in capacitor bank?

1007


WTA used cb?

1445






various transmission tower like .,D tower ,K.C.O tower ,C.C.O tower,K.C.R tower ,C.C.R tower ,H.C.O tower in different tons.

2664


What is the minimum IR value of HT/ LT cable? Pls post separetely!!!!!

1937


USE OF 8 WAY PAN ASSEMBLY

1494


Briefly describe your ideal job?

2559


Difference between control junction box (cjb) and power junction box(pjb)?

2981


if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?

1003


If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these

1577


Why AC & DC capacitor are use in UPS ??????????????????

1590


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

1737


What is stepper motor?

721