In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment
Answer Posted / abc
the above justification if for beam and not slab
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
difference between fc and fc'?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
what is the difference between natural draught cooling tower and induced draught cooling tower
pls give me some basic informations in construction of a structure?
What is the use of array command?
can you give me the details of rate analysis of steel and concrete?
What is the withdrawal force of steel nails?
Define Who designed the city of Washington DC?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Define the various stages of the project planning process in construction.
Moisture content calculation for diff mix ratio's ??
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?