Answer Posted / kkumar
QC--- means Quality control. Ensuring the quality of the
product while manufacturing. It is before final product.
Like various measurements, surface finish, tolerence, fits
ect....
QA--- Ensuring the functionality of the component / system
after assembly
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
generally how much percentage is required to sit in exam of PSU'S for mechanical engg. candidate (general category)
what is an intensifier?
Explain how is a submarine able to submerge and surface?
What do you treat in high alkalinity of boiler water?
What is the difference between projectile motion and a rocket motion?
Why do you need a keyway in the construction of a wall?
If mft not act when spark failure 3 time what problem will happen in boiler side
how many types of suspensions are used in automobiles?
what is the trignometry of lifting tools using the wire rope ? any formula for trignometry ?
WHAT IS DENSITY OF AIR AND PETROL MIXTURE IN 2 STROKE S.I.ENGINE
In terms of electrical enhineering, give a detailed explanation of the "earth fault loop path"
Explain the difference between projectile motion and trajectory?
what is advantage and disadvantage of forward curve and backward curve blade of an id fan impeller and FD fan impeller??
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is method to calculate the noise level at any point of duct if duct dimensions and air flow is known?