Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why transmission line 11Kv OR 33KV,66Kv not in 10kv 20kv?

Answer Posted / niranajn

since form factor for sinusoidal wave is 1.11 which is a
multiple of 11 so generation and transmission is done at
11,33,66kv

Is This Answer Correct ?    21 Yes 22 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the meaning of 40X8X2 busbar dimensions for carring load of 400 Amps

1999


What are reasond for high wattage in single phase induction motors

1885


sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers

1983


How to calulate Locked rotor amper(LRA) for compressor type motors?

1777


how much maximum load a 2 core (Single phase) 16mm aluminium wire can take ?

2636


regarding safety what would u consider the most important rules to observe when inspecting electrical equipment?

2051


A logic circuit that provides a HIGH output if one input or the other input, but not both, is HIGH, is a(n)?

1231


EHV current carrying parts need to have smooth finish,then how can a 245kv GIS with emery finish can run so long?

1889


What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?

2056


Why the efficiency of a three-phase induction is the motor is less than that of a three-phase transformer?

1128


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2269


can some one clearly explain why -48 volt DC use in telecom site????

1687


how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)

1892


How to assume answer to electrical questions

1533


300m long and 30kw inductive loade 3phase supply how many size cable required

1431