CONSIDER A 415V/200V STEP DOWN TRANSFORMER.CAN WE USE USE
IT AS STEP UP TRANSFORMER BY GIVING 200V IN SECONDARY AND
TAKING OUTPUT FROM PRIMARY?
Answer Posted / ashokreddyreguri
The given t/f is 415 v/200 v(h.v/l.v).
If the supply is given to 415 v side and o/p is taken from
200v side then it is step down t/f.
If the supply is given to 200 v side and o/p is taken from
415 v side then it is step up t/f.
We can use the same t/f tor step up and step down operations
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.
Why an ac systems are preferred over dc systems?
Difference between on line capacitor and Station type capacitor
what are the ''pitting rings''and how cn they be controlled in a series generator
HOW TO CALCULATE THE VT SIZING?
what work will do diffrential realay DG set
which is the best institute for PLC,SCADA,DCS in hyderabad
Is MEN and RCD related to each other ?? IF yes then how??
What is the function of electron gun used in crt?
if negative of DC supply used and positive is grounded through EGB, and if ELCB used in the system then is it sense the positive volatge and get tripped is it possible?
What is force on parallel conductors ?
if any body have question paper of railway (section engineering),then plz send me .i will thank of him/her.
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
what transformer we used normally and upto which kva?
how external lighting design? please give examples?