What is the reason for low voltage in houses?
Answer Posted / anand
Thhe probable reasons of low volage in houses are:
a)One of the phase on HT syde of transformer disconnected
because of breaking of jumper/HT fuse
b) excessive load on that particulr phase to which house is
conected
c)lower size of LT cable/ OH conductor selection resulting
in high voltage drop
| Is This Answer Correct ? | 18 Yes | 7 No |
Post New Answer View All Answers
Explain and give examples about VCB?
How LT megger works ?
What are the operation carried out in thermal power station?
If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?
What is lc oscillator?
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
We have studied about many techniques for finding the stability of system, ROOT LOCUS, ROUTH, BODE PLOT, POLER PLOT etc. In these which is used where. what are the difference among them... PLZ tell me.......
why only exciting current is shown not primary current in transformer???
What are the advantages and disadvantages of the ac motors?
I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.
Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir
Hi, Next week Iam appearing RRB exam for section engineer. So help me to get modal question papers for this position. Iam very thankful to you. Whether question will be fully techanical format or general form. Please give me a details regarding this exam.
We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
Convert a star connected network into a delta connected network.