Answer Posted / ramprasad
Testing can be started when the build is ready with the new
implementation / enhancements code and it is testable.
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
Can anyone please tell me how to export the requirements from QC 9.2 to excel file.
Explain cmm?
Explain the steps for bug cycle?
What is basis set?
Enlist some of the key challenges that are faced while performing software testing.
Diffrence b/w compiled module and shared repository?
draft an email to the client asking for clarrification on the conference calling function in a landline phone
Questions for role of a QC engineer at NDS,Bangalore 1st round is written 20 questions on aptitude and 10 question on testing Aptitude--problems on time and distance,tap problem,ages,time and work,probability, Testing 1.Difference Between QA & QC 2.Any 4 types of SDLC models with diagram. Also Pros and cons of each model 3.What is application Testing And embedded testing 4.Qualities of a good tester 5.Test cases for registering user. One field for user name,2 fields for password,"ok" and "cancel" button 6.What is a bug,explain Bug life cycle 7.Difference between priority and severity? 8.Some question on software design
What is branch testing and what is boundary testing?
What is your understanding regarding a test plan?
Define the role of qa in software development?
'configuration related errors' in testing means what?
Mention what are the test artifacts involved in qa?
What is backus-naur form?
What if the software is so buggy it ca not really be tested at all?