which grade of concrete is the strongest?
M20,M25,M30,M35 or M40?
Answer Posted / jainendra
M40 becoz the ratio of cement:sand:aggregate is higher
then the other. which are the core factor for any mix. the
property of any mix like compreesive strength,
characterstic strength etc . largely depends on the ratio.
| Is This Answer Correct ? | 52 Yes | 12 No |
Post New Answer View All Answers
how to design and calculate materail quantity for concrete speedbreaker ?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
WHAT IS YOUR CURRENT SALARY
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
how to calculate steel for slab or footings?
how many spacers we need for 1 ton reinforcement? aprox.
Different sizes of Hollow blocks and its weight. Thanks.
How do you calculate the unit weight of concrete?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
why & what is perchatage we are using fly ash in concrete?
List out the potential risk factors for workers on the construction site?
What things architect have to take care of before starting any project?
What are the applications of the modulus of elasticity?