Answer Posted / janet
E- Entry Criteria
T- Task
V- Validation
X- Exit Criteria
ENTRY CRITERIA:
Input with 'condition' attached.
e.g Approved SRS document is the entry criteria for the
design phase
TASK:
Procedures.
e.g Preparation of HLD,LLD etc.
VALIDATION:
Building quality & Verification activities
e.g Technical reviews
EXIT CRITERIA:
Output with 'condition' attached.
e.g Approved design document
It is important to follow ETVX concept for all phases in
SDLC.
| Is This Answer Correct ? | 48 Yes | 5 No |
Post New Answer View All Answers
What do enterprises do for QC 11 to prevent minimum data loss ?
What is metric?
What is upward compression?
If anyone is having ISTQB certification study materials,please send to gul.e.raina@gmail.com
Explain testability?
What is the common risk that leads to project failure?
What is intrusive testing?
What is a user friendly software?
Explain the term bug.
What is non-intrusive testing?
waht are somking types
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), WHO are the stakeholders of each stage?
What are the types of defects?
Hello, I would like to know which all versions of Testing tools (load runner, winrunner, qtp, test director) are no longer used and which versions of these which are being used?
what is the diff or relation between qa and verification qc and validation