how we can calculate the capacity of a proposed canal in a
command area.
Answer Posted / aditya sharma
depends upon cost benefit ratio .
Is This Answer Correct ? | 4 Yes | 6 No |
Post New Answer View All Answers
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
why does the most of civil engg is not intersted to going for teaching field?
What is the basic difference between OPC
Mention what are the composition of a landfill?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
Please design 12.5m long dubbly beam
What is Base Shear ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is meant by cartesian coordinate system?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
what is the steel difference between np-2 and np-3 pipes and weight also
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.