Answer Posted / guest
civil engineering
it is a line of construction in which we consider all tye
of possiblities, like earth quake, wind load, dead load,
requirement form the client
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Explain what are the problems one might face while having a Cantilever balcony?
How much percentage of brick bats allowed in CD-75 bricks
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
How to calculate construction cost of residential building in mumbai
Define What is aggregate?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
please briefly explain calculating or estimating steel quantity for a RCC column?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What is the cost difference between site mix and ready mix concrete per cubic meter
What is the density of most of construction materials?
When was the first motorway built in england?
pls tell me about method of cutting length of ties column
Give me an example of a time when something you tried to accomplish and failed.