Answer Posted / m nanda kishore
the grid is also referred as infinite bus bar in terms of
synchronisation but it also implies fixed voltage,fixed
frequency,phase seuence,phase voltages
| Is This Answer Correct ? | 110 Yes | 23 No |
Post New Answer View All Answers
How much of the total hydro power potential has been exploited so far in india?
advantages and disadvantages of inverse definite minimum time RELAY
how to get electrical supervisor competency certificate in gujarat. i did 3 year diploma in electrical
What do you mean by phasors?
State and define ohm’s law?
Please define ampere?
what is the principle of the single phase energy meter? and,what is the advantages and disadvantages of single phase energy meter?
What are the parts in a inverter?
How to calculate loses in transformer of 160 KVA ?
how we can decide that what value of ht line will come to any commercial building? (ans except According to the building load)
If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a camp site.?
What is the test block protection relay if any body know plz explained
A low wet bulb temperature indicates
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
How many points does a Circuit can have?