Answer Posted / a.alexander
1.reduce electrical short circuit.
2.reliability.
3.safty
4.fast working
Is This Answer Correct ? | 4 Yes | 9 No |
Post New Answer View All Answers
What is the difference between a Root Locus plot and a Bode plot?
what happen when we add mentos in cold drink?& why?
what are the standard IR values should be of R-E, Y-E, B-E, R-Y, Y-B, B-R of VCB in closed condition and in open condition for 500KVA & 1000KVA transformers. and what is the acceptable range when tested by 5000V megger.
What is deference between MCB & MCCB & ISOLATOR
What is the unit of charge and current?
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
How will change the frequency in distribution side?
Define coil span?
in basic 2 phase will short means tripping the power but spot welding 2 phase shorting but not tripping it will welded why.....(Q)
what's the difference between 'shaft power demand' and 'BHP' , when we consider electrical load list.
How to calculate cable size in HT AND LT
we have a rewind motor of 2Hp,2800Rpm, 220Volt AC. how can we choose the running capacitor for this motor, any formula for that?
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
How many gap between finger contact in a.c.b. and v.cb.?