Answer Posted / bimal
Transformer testing is mainly done to know the correctness
of wdg,core, etc.....
The Lv tests are.
Vector Group,Magnetic Balance,Magnetizing Current,Ratio,
Hv test are.
Impulse test,switching,etc.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
How to protect sensitive loads such as Dosing pumps inside a factory from voltage surge/voltage fluctuation.
Make a list observation on Transformer?
What is meant by full pitched winding?
Y phase plates are used in transmission line??? what is there need???
What is Percentage impedence of a transformer? why it is expressed at a percentage? what is the importance of percentage impedence in case of a transformer?
Explain what is rated speed?
can we synchronize star system generators with delta system generators?
how rectifier transformer work in electroststic precipetatore(esp?
what is the meaning of vcc
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
Why is better to have a minimum ceiling voltage of 250% than 160%?
how to find out 3 phase complex power in per unit in unbalanced system?
What is the main cause of magnetism?
what is the working principle of energy saver control panel. please give the complete calculation & theory.
what is the difference between circular wdg & ractangular wdg?