Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do you mean by 1 ton in AC`s

Answer Posted / s.pushparaj

The amount of the heat required to convert 1 ton (2000
pounds)of ice in to water within 24 hours. The initial
temperature of water is 0 deg C.

Latent heat of ice= 144 BTU

1 TR= 144 X 2000
= 288000 BTU/24

For 1 hour

We can divid by 24 So 288000/24=12000BTU



1TR=12000BTU/Hr
=3024 K Cal/Hr
= 12600 K Jul/Hr
= 3.52 HW OR K Jul/Sec

Is This Answer Correct ?    89 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the permissable nutral current of three phase system as per IS standards?

2116


How can calculate the rating of a servo stabilizer for given a specific load

3529


Pl. share your experience about industrial-electronics repair of machine tool.

1905


Should power factor be low or high?

1178


Draw the DOL starter and star delta starter drawing?

2998


Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks

1856


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1939


HOW TO CALCULATE HV CABLE SIZING?

3215


What is the basic rule for block diagram reduction technique?

1253


with out colour codeing on conductor how can be find what is r,what is b,what is y phases.....

1955


who many types of fire explane with exmple

2218


How many turns are there in primary winding? (In Transformer)

1709


When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<

2158


high voltage transformer input voltage,current and amps rating..distributed transformer input voltage,current and amps rating...

2010


How much of the total hydro power potential has been exploited so far in india?

1126