Answer Posted / muthuraman
V-model is nothing but test approach based on
the way the software should be build.
SRS user acceptance
ANALYSIS system testing
HLD Integration testing
LLD Unit Testing
Coding
In V-model, testing phase start as soon as get the SRS.
Thanks,
Muthuraman.K
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How will you define a critical bug?
how to download fullversion of JIRA(defect reporting s/w) s/w for free.can any provide web site for full version free download.
What is coverage measurement?
repeated testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or unrelated software component:
What is test case generator?
What is usability?
Draw the Framework Architecture of Selenium RC with combination of Selenium webdriver?
What is end-to-end testing?
Which activity in the fundamental test process includes evaluation of the testability of the requirements and system?
Which is the best institute in chennai to learn Softyware testing? Please help.
is manual testing enough for 2+ yrs,does it need any tools
What are verification and validation?
When is it ideal that the testing is stopped?
Explain interface?
Does anybody used Visio in QA.If so, can u please explain where and when u used visio diagrams