What is the meaning of Dyn11 of Transformer.

Answer Posted / abhinav yadava

Dyn11 is vector group notation of tansformer.It means LV
winding,which is star connected (written in small letters
means LV side and vice versa)is 30 degrees lagging by HV
winding which is delta connected.In India we go for +-30
deg connection of transformer.

Is This Answer Correct ?    131 Yes 49 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

defination of controlled shunt reactor

1787


What are the various kind of cables used for transmission?

631


What is float cum boost charging system?

1579


ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH

3703


Why ground terminal is used in pot meter 10k ohms

1444






how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

1913


what is working process of star delta controlling circuit ?

1404


How to address the servo drive for motor

1545


High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?

1632


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1097


how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?

2155


why co incidence factor considered in transformer sizing?

1417


explain the Trip supervision circuit

1658


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

896


How to measure current and voltage in an ELV circuit

3611